Engineering Document Management for EPCC- built for control, compliance, and delivery
Run multiple projects on one platform with standardized folder structures, automated numbering, controlled reviews, and transmittal/correspondence governance, aligned to BIMinformationmanagement patterns and ISO 19650-ready CDEworkflows.
Control revisions, deliverables, reviews, and transmittal cycles across disciplines – without spreadsheet chaos.
For QA / Document Control
Enforce naming conventions and auto-numbering, approvals, traceability, and audit evidence – consistently across every project.
EPCC REALITY
EPCC document control breaks under multi-party delivery
When multiple contractors, disciplines, and stakeholders exchange drawings and documents, failures tend to cluster around version confusion, inconsistent transmittals, unclear review status, and incomplete audit evidence.
Revision ambiguity
“Which is the latest approved IFC drawing?” becomes a daily risk.
Transmittal leakage
Manual cover sheets, missing distribution lists, and uncontrolled resends.
QA evidence gaps
Approvals and markups live in email threads instead of the record.
MDR drift
Deliverable status becomes a manual, late, and disputed report.
MULTI-PROJECT EDMS (MOCK)
One platform • multiple projects • consistent control
Replace manual cover sheets and email-based approvals with controlled, traceable processes — including incoming/outgoing/internal transmittals and correspondence management linked to deliverables.
Transmittals automation
Auto-generate cover sheets, assign distribution lists, track acknowledgements, and link to document/drawing revisions.
Reviews & approvals
Role-based review routes with due dates, gates, and approval evidence, designed for multi-party EPCC delivery.
Markups & comment consolidation
Consolidate annotations and comments, assign actions, and close out review cycles with traceability.
Controlled submittals reduce disputes: “who sent what, when, and which revision”.
BIM / ISO 19650 ALIGNMENT
ISO 19650-ready Common Data Environment patterns
ISO 19650 describes information management concepts for BIM projects, including the use of a common data environment (CDE) and the use of naming conventions and status metadata for information containers.
What we configure for you (typical)
CDE workflow states (WIP → Shared → Published → Archived) and controlled transitions.
Information container metadata for naming/status and permitted use (aligned to your EIR/BEP).
Review/approval gates before sharing/publishing, for QA assurance and contractual clarity.
Note: “Compliance” depends on your project requirements and configurations; we implement templates aligned to your agreed conventions.
Practical win: QA can prove what was approved and issued — with status and revision traceability.
DELIVERABLES CONTROL
MDR / SMDR that stays accurate as work changes
Track deliverables across disciplines with live status, revisions, review outcomes, and transmittal history — without manually reconciling spreadsheets.
MDR visibility
Status by phase, discipline, and contractor; link each line to the authoritative document/drawing.
SMDR traceability
See what was submitted, when, to whom, and which revision — tied to transmittals and correspondence.
Result: fewer disputes and rework from stale registers; clearer progress for management reviews.
DISCOVERY
Find drawings and documents in seconds — not hours
Full-text search across content and metadata enables faster issue resolution, fewer duplicate requests, and better reuse across projects. Optional AI integration can provide guided retrieval and summarization within permission boundaries (where enabled).
Gentle pushback
AI is only valuable when the underlying information is governed: stable revisions, traceable approvals, and permission-aware access. Start with EDMS fundamentals; then add AI where it accelerates QA and engineering decisions.
Guardrail: results reflect user permissions; AI (if enabled) must respect the same access model.
PLATFORM
ALFRESCO ECM
Enterprise-grade ECM for engineering deliverables
Built on Alfresco’s repository capabilities to support secure storage, metadata-driven governance, RBAC, audit trails, and scalable search — deployable on-prem or private cloud to align with enterprise IT and project governance.
Security & control
RBAC, audit evidence, controlled workflows.
Integration-ready
APIs for reporting, dashboards, and external systems.
Scale for EPCC
Multi-project, multi-party delivery patterns.
Search at core
Full-text + metadata search; optional AI layer.
Standardize EPCC document control — and make ISO 19650-ready delivery repeatable
We’ll map your folder templates, numbering rules, transmittal workflows, and review gates to your execution model (EIR/BEP), then deliver a pilot project in weeks — ready for scale across programs.